Okuma Alarm-A 8542 Synchronizing spindle phase


Okuma Alarm-A 8542 Synchronizing spindle phase
An action order for spindle was performed in a spindle phase synchronous mode.

Object
system

Code
11->The order which switches a spindle mode was performed. (The spindle which is turned into the same phase.)
12->A spindle revolution order was performed. (The spindle which is turned into the same phase.)
13->A spindle indexing command was performed. (The spindle which is turned into the same phase.)
14->C axis control mode ON command was performed. (The spindle which is turned into the same phase.)
15->A spindle gear renewal order was performed. (The spindle which is turned into the same phase.)
16->Flat-turning command was performed. (The spindle which is turned into the same phase.)
17->Spindle synchronous mode command was performed. (The spindle which is turned into the same phase.)
18->Lowest speed mode command was performed. (The spindle which is turned into the same phase.)
19->Spindle phase synchronous mode command was performed. (The spindle which is turned into the same phase.)
21->The order which switches a spindle mode was performed. (The spindle which does a phase same.)
22->A spindle revolution order was performed. (The spindle which does a phase same.)
23->A spindle indexing command was performed. (The spindle which does a phase same.)
24->C axis control mode ON command was performed. (The spindle which does a phase same.)
25->A spindle gear renewal order was performed. (The spindle which does a phase same.)
26->Flat-turning command was performed. (The spindle which does a phase same.)
27->Spindle synchronous mode command was performed. (The spindle which does a phase same.)
28->Lowest speed mode command was performed. (The spindle which does a phase same.)
29->Spindle phase synchronous mode command was performed. (The spindle which does a phase same.)