Okuma Alarm-C 3254 Schedule program start
When the machine was linked with a robot/loader through the interface type C and the schedule program operation mode was selected, the cycle start command was issued.
Or else, the schedule program was started when the machine is linked with a robot/loader through the interface type C.
Probable Faulty Locations
(1)With the machine linked with a robot/loader in the schedule program operation mode, the cycle start command was issued.
(2)The schedule program operation was attempted with the machine linked with a robot/loader.
Measures to Take
(1)Select a main program instead of a schedule program.
(2)Set off the link switch.